About Us
Castlepoint Numa was founded in 1988. Since then, the company has made community improvement the centerpiece of their development strategy. As a result, they have been the driving force behind a dazzling array of highly successful real estate ventures throughout the Greater Toronto Area. In particular, Castlepoint’s work in heritage restoration, brownfield redevelopment and waterfront re-use has won plaudits throughout the industry.
Castlepoint Numa: Previous Projects
L Tower. Developed in conjunction with Fernbrook Homes and Cityzen Development Group, the L Tower was completed in November 2014. The building eye-catching curved design rises 58 storeys and includes 600 units, with a long list of available amenities. All the employment centres and other major destinations of Downtown Toronto are within walking distance, with Union Station also just steps away.
Backstage Condos. Also completed in conjuction with Fernbrook and Cityzen, Backstage Condos is a 36-storey, 284-unit high-rise on Yonge St in Downtown Toronto. Completed in 2017, it features amenities such as a stunning rooftop pool and luxury interior features.